UTF-8
Errata: October 19, 2021

Thank you for purchasing Kanban in Action. Please post errata not listed below in this book's LiveBook Errata thread. We'll update this list as necessary. The following corrections have been made to all formats during the book's second printing. Thank you!



In Front Matter, Section The structure of this book, page xx

In Paragraph 1, This book is divided into four parts... should be This book is divided into three parts....

In Front Matter, Section The structure of this book, page xxi

In Paragraph 1, delete bullet point 4, there is no Part 4 in the book.

Chapter 2, Section 2.2 Get started right away, page 54

In the last comic caption at the bottom of the page Read more about this in chapter 4... should be Read more about this in chapter 6....

Chapter 5, Section 5.1.1 What is work in process?, page 95

In first diagram at the top of the page Average time it takes to complete each item should be Average number of items completed per time unit.

Chapter 5, Section 5.2.1 Context switching, page 100

Image at bottom of the page has been corrected and replaced.

Chapter 9, Section 9.3.1 A line of cards, page 202

In Bullet point 6, the entire bullet point should read: Repeat steps 4 and 5 until you're out of cards. The question will now be "Where should this card be placed in relation to the card already on the table?" and then place the card in the right slot depending on its estimated size.

Chapter 9, Section 9.3.2 Planning Poker, page 204

In graphic, the second card is 4, it should be 3, so the card numbers are: 13, 3, 8, 2.

In Bullet Point 7, (2, 4, 8, and 13 for example) should be (2, 3, 8 and 13 for example).

In Bullet Point 7, Subbullet Point 1 What did the people estimating 2 and 4 story points think the item meant? should be What did the people estimating 2 and 13 story points think the item meant?

Chapter 9, Section 9.5.1 The need diminishes, page 211

In Paragraph 1, see chapter 3's discussion of Little's law). should be see chapter 5's discussion of Little's law, page 95).

Chapter 11, Section 11.2.1 Statistical process control (SPC), page 258

In Bullet point 2, ≈ 3.4 should be ≈ 3.7

In Bullet point 3, 3.4 (one sigma) = 28 days should be 3.7 (one sigma) ≈ 28 days

In Bullet point 4, = 20.2 days should be ≈ 20 days

Chapter 11, Section 11.2.2 Cumulative flow diagram (CFD), page 262

Both charts on this place have been corrected and replaced.

Chapter 11, Section 11.2.2 Cumulative flow diagram (CFD), page 263

In third bullet point halfway down the page the sentence If a project had a backlog that was set already, the Inbox area would shrink over time. should be If a project had a fixed backlog, and nothing was added to it over time, the Inbox area would shrink over time.